Welcome Guest. Please Login or Register. Mar 30th, 2018, 9:04pm
ATTENTION MEMBERS: Conforums will be closing it doors and discontinuing its service on April 15, 2018. We apologize Conforums does not have any export functions to migrate data. Ad-Free has been deactivated. Outstanding Ad-Free credits will be reimbursed to respective payment methods.
Re: here is 1 I just finished
« Reply #4 on: Nov 6th, 2009, 08:22am »
4" toe kick cut out is 2 1/2" x 4" then i use 4"x 3/4" toe kick I left the center box under the cabinet open so the box is the floor vent then used a drop in floor vent and drilled a screw hole in each end cut the toe kick so the vent sets in it and put a pocket screw in each end to hold it
Re: here is 1 I just finished
« Reply #6 on: Nov 7th, 2009, 06:46am »
I do use a toe on each box only it is inside the sides like the bottom and streachers I just left out the toekick backer on the center box for the air flow then I use 3/4 to skin the front 1 piece that allows me to 45 the out side corners I like to return ends also its a much cleaner look 3/4 is a great selling point
Re: here is 1 I just finished
« Reply #7 on: Nov 7th, 2009, 07:47am »
you could have not made your toekick strecher as tall just 4 inches and let the air flow come over the top of the strecher and not cut a vent in the front a lot cleaner look still a fine set of cabs.
Re: here is 1 I just finished
« Reply #8 on: Nov 8th, 2009, 06:19am »
maybe but then they could not shut off that room when needed we had to have a vent for this 1 I normaly wood rout through the toe and make it a vent I dont like to see a joint eather so the joint is covered with the vent